Summer Camp 2021 is completed, but there is still much activity and noise on The Villa’s property. We have many projects underway. We switched Kindergarten and PreK 1 classrooms to accommodate more children in Kindergarten. We have moved furniture, books, toys, supplies and loads of stuff from one side of the third floor to the other. Much maintenance is being done from cleaning each room from top to bottom, and touch up painting walls and shelves. (Our little ones have drawn on some of these.) We also have some construction projects happening while the children are away. Sheet metal and metal caps are being installed over the capstones along the perimeter of the roof. Some gutters and down spouts are being replaced. Our maintenance men sawed and took apart the playscape in the lower portion of the playground. Next week the old concrete footings will be pulled out to make way for the new playscape to be installed. We are patiently waiting for the new playscape and surfacing to be installed. There are many more projects to complete on Sr. Alice’s and Ms. Kris’ “To Do List,” so we can be ready for the start of a new school year on August 16th.